SME Consultant - Data Center Construction

$50 - $75/hr

Location
Remote (United States)
Workplace
Remote solely
Employment
Fractional

About this role


Position: SME Consultant (Data Center Construction)

Pay: $50-75/hr (1099)


Please note this is an hourly contract position with variable hours and is not eligible for company benefits. Work is 100% remote.  Some availability during business hours is needed to attend scheduled Zoom meetings.


SMEs serve as advisors to Interplay and play a key part of our growth by helping us build industry-leading training content to advance the data center industry.


At this time, we are looking for subject matter experts with direct data center construction expertise in one or more of the following areas:

  • Electrical
    • Install switchgear, transformers, generators, UPS systems, power distribution units, busways, panels, grounding, lighting, and receptacles.
  • Network and fiber 
    • Install structured cabling, fiber-optic cable, telecommunications systems, access control, cameras, alarms, and building controls.
    • Terminate, splice, test, label, and certify connections between equipment rooms, racks, and network infrastructure.
  • Rack Installation
    • Assemble, position, anchor, bond, align, and label server racks, install rack accessories and prepare them for power, cabling, and IT equipment.
  • HVAC
    • Install chillers, cooling towers, air-handling units, computer room air conditioners, pumps, piping, ventilation, and controls.
  • Plumbing and Pipefitting
    • Install domestic water, drainage, fuel-gas piping, condenser-water piping, chilled-water piping, and equipment connections.

 

You will play a critical role on the Production Team, working with designers & developers to create and review content for skilled trades training.

 

Why this position:

  • Flexible work hours, remote work
  • Use your expertise to make an impact and provide education
  • Collaborative, supportive team

 

What you'll do:

  • Advise internal teams on industry dynamics and best practices
  • Use your expertise to support content development for VR simulations and eLearning videos
  • Advise on construction and installation
  • Develop and assist in the creation of procedure guides
  • Write and record voiceover scripts and screencasts for videos 
  • Generate valid and reliable test questions/knowledge checks
  • Develop fault scenarios
  • Review courses for accuracy

 

Who you are:

  • Extensive knowledge of Data Center Construction
  • Teaching or training experience is preferred
  • Organized and communicative with the team
  • Desire and ability to collaborate with designers and developers and respond to queries and feedback within 1-2 business days

 

Requirements:

  • Extensive knowledge of subject matter
  • Systematic approach to troubleshooting
  • Research skills
  • Teaching, training or mentoring experience is ideal
  • Computer skills - G-Suite (Google Docs, Sheets, Slides)
  • Camtasia (video tutorial and presentation software), will teach
  • Writing skills for knowledge checks and procedure guides
  • Availability during business hours to attend scheduled Zoom meetings
  • We may ask you to record a video intro for the hiring team if your application looks like a potential match. Instructions will be sent.


Equal Employment Opportunity

Interplay Learning is committed to providing equal employment opportunity (EEO) to all qualified employees and applicants for employment without regard to race, color, religion, gender, sexual orientation, national origin, age, disability, pregnancy, marital status, gender identity or expression, status as a veteran, or any other legally protected characteristic or activity in accordance with applicable federal, state and local laws.

As a federal contractor, Interplay Learning takes affirmative action to consider qualified individuals without regard for disability and protected veterans status.

Individuals with disabilities who need assistance with the application or recruitment process must promptly contact the HR Department to discuss their particular needs.


Interplay Learning does not discriminate against employees or applicants for discussing, disclosing, or inquiring about compensation.


We believe in fostering a welcoming and inclusive workplace and encourage everyone to apply, regardless of background.


Our hiring decisions are guided by skills, experience, and a shared commitment to our values. If you have any questions about our process, we’re happy to provide support and guidance along the way.

 




Apply to Interplay Learning

Clera fills in Interplay Learning's application for you.

How it works

Open the role in Clera

Sign in, and this role opens on your Clera job board, ready to apply.

Clera fills in the application

Clera fills the form from your profile and resume, and asks what's missing.

Track it in Clera

Each application you send shows up in your Clera tracker, sorted by stage.

Want Clera to find roles for you?

Ask your AI about this role

It knows you. Clera gives it the role.

Does this role fit my profile?

First time? Connect Clera once, about a minute.
One click above pre-fills the connector. Or by hand: Settings > Connectors > Add custom connector, paste https://mcp.getclera.com. Either way, sign in with the account you use on Clera and approve the consent screen.
https://mcp.getclera.com

Sign in with your Clera account. MCP docs

About Interplay Learning

Our mission is to build better training, careers and lives for our customers and their employees in the HVAC, Plumbing, Electrical, Solar & Facilities Maintenance industries by delivering scalable and highly effective digital learning simulations.

Our platform recreates life-like VR scenarios for skilled trades workers, allowing them to learn in a more engaging environment. The result is a workforce that is confident, highly skilled and ready in just a few weeks, not years.

Our scalable, Comersive Learning solution compresses time from beginner to mastery – and can efficiently train hundreds of workers to be job-ready at the same time – quickly. Our revolutionary technology speaks for itself. Interplay Learning was named to the 2020 Inc. Best in Business list, won the AI Breakthrough Award for Best Use of Virtual Reality for Enterprise Applications and is an AHR Expo – Innovations Awards 2020 Winner.

Welcome to the next generation of the skilled labor workforce.

Team size
51-200 employees people
Founded
2016
Industry
E-Learning Providers
Workplace
Remote solely
Locations
United States