Computational Plasma Research Summer 2027 Intern

$57/hr

Location
Everett
Workplace
On-site
Employment
Internship

About this role

About Helion

We are a fusion power company based in Everett, WA, with the mission to build the world's first fusion power plant, enabling a future with unlimited clean electricity. Our vision is a world with clean, reliable, and affordable energy for everyone.

Since Helion's founding in 2013, we have raised $1.5 billion from long-time investors such as Sam Altman, Mithril, and Capricorn Investment Group as well as new investors including Thrive Capital, LightSpeed Venture Capital, SoftBank, and others to propel us forward. Our current prototype, Polaris, has reached record-breaking plasma temperatures of 150 million degrees Celsius (13 keV). Helion is continuing to iterate and on the path to the world's first fusion power plant, Orion.

This is a pivotal time to join Helion. You will tackle real-world challenges with a team that prizes urgency, rigor, ownership, and a commitment to delivering hard truths – values essential to achieving what no one has before. Together, we will change the future of energy, because the world can't wait.

What You Will Be Doing:

The computational research team at Helion works with multiple plasma simulation codes to simulate and analyze Helion’s fusion machines and test beds. The goal of the simulation effort is to develop predictive computational capabilities derived from first principles, validated against experimental data across multiple FRC merging devices, to inform next-generation fusion machine design.


You Will:

  • Be responsible for using Helion’s computational suite of tools to study a particular aspect of the machine, which could include FRC formation, translation, merging, or compression

  • Work with your team and mentor to develop a simulation study and develop a set of results

  • Develop a report and present your findings to the broader research team at Helion

Required Skills:

  • Ability to work full time, onsite in Everett, WA for a minimum of 12 consecutive weeks during summer 2027

  • Currently pursuing a PhD in Physics, Aerospace Engineering, or a related field, with relevant experience in plasmas

  • Must be able to complete their PhD program and commence full-time employment no later than June 2028

  • GPA of 3.0 or above

  • Experience working with plasma simulation codes (e.g. PIC, Vlasov codes, MHD)

  • Experience doing research in a team environment

  • Scripting and analysis in Python, C++ or MATLAB

Apply to Helion

Clera fills in Helion's application for you.

How it works

Open the role in Clera

Sign in, and this role opens on your Clera job board, ready to apply.

Clera fills in the application

Clera fills the form from your profile and resume, and asks what's missing.

Track it in Clera

Each application you send shows up in your Clera tracker, sorted by stage.

Want Clera to find roles for you?

Ask your AI about this role

It knows you. Clera gives it the role.

Does this role fit my profile?

First time? Connect Clera once, about a minute.
One click above pre-fills the connector. Or by hand: Settings > Connectors > Add custom connector, paste https://mcp.getclera.com. Either way, sign in with the account you use on Clera and approve the consent screen.
https://mcp.getclera.com

Sign in with your Clera account. MCP docs

About Helion

Helion is building fusion power plants, with its first due to supply Microsoft in 2028.

Team size
501-1,000 employees people
Industry
Renewable Energy Power Generation
Workplace
On-site
Locations
Everett, Washington, United States