PC - Gurugram - MRF - Waste Management

Location
Narsinghpur
Workplace
On-site

About this role

esponsibilities and Duties: 

Repurpose project:-  
 Preparing the estimate targets for each month with the breakup between DWCC’s.  
 Ensuring to achieve the Repurpose target of every month before the last week of the month.  
 Scheduled visits to the DWCC to crosscheck and monitor the operations at DWCC.  
 To liaison with Govt officials for smooth operations of DWCC.  
 Coordinating with Project Coordinator (Repurpose project POC internal & external) to submit all the 
documents timely.  
Documentation:-  
 To coordinate with all DWCC’s where MoU has been signed for sourcing of good segregated dry 
waste & purchase of few sorted materials as per MRF requirement.  
 To capture the data in DWCC app & ensuring the maintenance of reports & required forms.  
 To capture sorting details daily or as and when sorting takes place and cross check with the inward 
quantity at DWCC and dispatch quantity to the MRF.  
 Timely verifications of the documentation captured every day.  
 To capture all the required details at DWCC to prepare a month on month PnL for DWCC’s.  
 Ensuring the submission of invoices with rejected quantity details for the materials sourced from all 
DWCC.  
 Maintaining the complete Data base w.r.to DWCC operations  
 Weekly & monthly progress update to the reporting manager  
Operations:-  
 Coordinating with ULB officials & DWCC operators for the smooth operations & to improve the 
quality of source segregation.  
 Coordinating with the Operators to communicate the monthly targets of materials & support to 
improve the productivity & improve the quality of sorting at DWCC.  
 Coordinating for loading & unloading of DWCC materials at source & at the MRF.  
 Ensuring the timely renewal of MoU with the DWCC & report the project progress to them every   
month.  
 To do regular audits at DWCC & support for the external audits  
 Capacity building of Pourakarmikas to improve the source segregation  
 Coordinating with BWG in the mapped ULB’s for the collection of segregated dry waste. 


Tired of cold applications?

Sign up with Clera and we'll reach out the moment a role actually fits you — no more spraying applications into the void.

Know someone who'd be great for this?