Data Center - Construction Manager

Location
Abilene
Workplace
On-site

About this role

AFL provides industry-leading fiber optic products and services across the globe. Our company was founded in 1984 with a single fiber optic cable and now we manufacture over two thousand products, employ over 5,000 associates and consistently generate annual sales in excess of a billion-dollars in revenue. With our commitment to professional growth and employee development, let AFL “Connect” you to your next career opportunity!

Job Summary – Data Center Construction Manager

The Data Center Construction Manager leads fast pacedinfrastructure build outs, upgrades, and expansion projects within hyperscale, enterprise, and colocation data centers. This role executes project plans by coordinating and scheduling assignments, managingmaterialslogistics, equipment, contractors, and toolsrequiredto deliver projects on time and within budget. The position requires proactive communication, detailed planning, and strong collaboration with both internal and external stakeholders. This is a key leadership role responsible for ensuring all construction and installation activities meet customer expectations, datacenter standards, and compliance requirements.

Responsibilities

Project & Team Leadership

  • Reports directly to the Operations Manager and leads onsite construction and installation teams.
  • Coordinatesdaytodayactivities for electrical, mechanical, cabling, commissioning, and general construction crews.
  • Conducts daily safety briefings, JSA’s, toolbox talks, and enforces adherence to all site safety requirements.

Technical Execution

  • Oversees the installation and integration of data center systems including:
    rack/stack hardware, structured cabling, fiber systems, PDUs, busway, grounding, containment systems, HVAC components, and power distribution equipment.
  • Working knowledge ofAC/DC power systems, UPS systems, battery strings, generators, and -48Vdc power.
  • Ability to lead crews through complex tasks on active datacenter floors and equipment rooms.
  • Demonstratedproficiencyin at least one area:
    structured cabling, fiber splicing/testing, electrical/conduitinstallation, mechanical systems, or equipment commissioning.

Testing, Quality, & Documentation

  • Working knowledge of test equipment including OTDR, power meters, fiber certification testers, thermal imaging tools, circuit analyzers, and other commissioning gear.
  • Ability to evaluate test results, troubleshoot infrastructure faults, respond to trouble tickets, and support maintenance activities.
  • Conduct site surveys, quality assurance reviews,punchlistwalkdowns, and verify construction meets design and customer standards.
  • Prepare daily/weekly progress reports, feasibility assessments, and project documentation.

Project Coordination

  • Manage material procurement, storage, and onsitelogistics.
  • Ensure all installation work aligns with engineering drawings, MOPs, and datacenter operational requirements.
  • Collaborate with electrical, mechanical, network engineering, commissioning agents, and facility operations toidentifyand resolve issues.
  • Provide customer support, including direct communication during builds, guidance on issue resolution, and management of customer expectations.
  • Ensure compliance with company Environmental, Health & Safety (EHS) policies.

Personal Qualities

  • Leadership:Proven success leading high-performanceteams in mission criticalenvironments.
  • Analytical Thinking:Ability to interpret technical data to drive decision-makingand project outcomes.
  • Conflict Resolution:Skilled at building consensus,anticipatingissues, and resolving onsite conflicts.
  • Results Driven:Able to manage multiple competing priorities with strong execution discipline.
  • Communication:Effective at communicating plans, interpreting policies, and presenting updates to stakeholders.
  • Relationship Building:Able to work in cross functionalenvironments anddemonstratestrong teamleadership.

Qualifications

  • Associate degree in a related technical field, orfive (5) yearsequivalent experience in datacenter ormissioncriticalfacility construction/management.
  • Strong technical background in datacenter infrastructure, including electrical, mechanical, and structured cabling systems.
  • Familiarity with IT, networking, and datacenterarchitectures.
  • Ability to think critically,problemsolve, and make sound decisions under pressure.
  • Ability to handle sensitive information with discretion.
  • Strong organizational skills and attention to detail.
  • Exceptional written and verbal communication abilities.
  • Current industry certifications preferred (e.g., BICSI, OSHA, PMP, Data Center ops certifications).

Working Conditions

  • Use of hand tools and power tools asrequiredfor site work.
  • Frequent climbing of ladders, navigating raised floors, and working in construction zones.
  • Ability to lift and carry equipment and materials.
  • Standard hours Monday–Friday, 8:00am–5:00pm; however, afterhours and weekend support may berequiredduring critical cutovers or maintenance windows.
  • Travel required based on project locations.
  • Mustbe authorized towork in the United States.

Minimum Education

PreferredDegree or Type

B.A.or equivalent experience

Business Administration/Engineering

Tired of cold applications?

Sign up with Clera and we'll reach out the moment a role actually fits you — no more spraying applications into the void.

Know someone who'd be great for this?