Clera - Your AI talent agent
LoginStart
Start
Crusoe logo
Crusoe

Data Centre Construction Safety Manager

full-time•Abilene•$135k - $170k

Summary

Location

Abilene

Salary

$135k - $170k

Type

full-time

Experience

5-10 years

Company links

WebsiteLinkedInLinkedIn

About this role

Crusoe's mission is to accelerate the abundance of energy and intelligence. We’re crafting the engine that powers a world where people can create ambitiously with AI — without sacrificing scale, speed, or sustainability.

Be a part of the AI revolution with sustainable technology at Crusoe. Here, you'll drive meaningful innovation, make a tangible impact, and join a team that’s setting the pace for responsible, transformative cloud infrastructure.

About The Role:


Crusoe is rapidly expanding hyperscale AI data center infrastructure in Abilene, Texas and
across multiple U.S. campuses. We are seeking an experienced Data Center Construction
Safety Manager to lead health, safety, and environmental programs during the most critical and
high-risk phases of construction.
This role sits directly at the intersection of heavy industrial construction and mission-critical
infrastructure. You will own safety performance during large-scale workforce ramp, heavy
equipment operations, and the transition from construction site to live, energized environments.


This is a highly visible role partnering closely with construction leadership, general contractors,
commissioning teams, and site operations.


At Crusoe, you'll play a critical role in ensuring our infrastructure is delivered safely, responsibly,
and at global scale.


What You'll Be Working On:


● Own site-wide health, safety, and environmental programs for hyperscale data center
construction projects
● Perform daily on-site safety walkthroughs focused on trenching, crane operations,
scaffolding, and heavy equipment
● Lead safety oversight during electrical commissioning and the transition to live power
environments including UPS, switchgear, and generators
● Enforce compliance with OSHA 1926 construction standards and NFPA 70E electrical
safety requirements
● Review, approve, and manage high-risk permits including Hot Work, Confined Space
Entry, and Critical Lifts
● Audit general contractor safety programs and lead weekly safety leadership meetings
● Track and report incident rates, near misses, and leading safety indicators
● Establish and maintain emergency response plans, evacuation routes, and medical
response procedures

● Partner closely with construction, commissioning, and operations teams to foster a
strong safety-first culture


What You'll Bring to the Team:


● Bachelor’s degree in Occupational Health & Safety, Environmental Science,
Construction Management, or a related field
● 5+ years of experience in heavy industrial construction safety environments such as oil
and gas, power generation, or large-scale manufacturing
● Current OSHA 30-Hour Construction certification
● First Aid, CPR, and AED certification
● Deep working knowledge of OSHA construction regulations
● Strong command of NFPA 70E, including electrically safe work conditions, arc flash
boundaries, and PPE selection
Ability to work full time on active construction sites, including walking long distances,
climbing ladders, and working outdoors in varying conditions
● Proven ability to influence site leadership and manage safety performance under
aggressive project timelines


Nice to Have:


● Prior experience supporting data center construction or commissioning projects
● CSP, ASP, GSP, or CHST certification
● Experience managing complex lockout/tagout procedures for redundant power systems
● Proficiency with Microsoft Excel, PowerPoint, SharePoint, and Teams
● Experience using safety or construction management platforms such as Procore or
SafetyCulture/iAuditor


Benefits:


● Industry competitive pay
● Restricted Stock Units in a fast growing, well-funded technology company
● Health insurance package options that include HDHP and PPO, vision, and dental for
you and your dependents
● Employer contributions to HSA accounts
● Paid Parental Leave
● Paid life insurance, short-term and long-term disability
● Teladoc
● 401(k) with a 100% match up to 4% of salary
● Generous paid time off and holiday schedule
● Cell phone reimbursement
● Tuition reimbursement
● Subscription to the Calm app
● MetLife Legal
● Company paid commuter benefit; $300 per month


Compensation Range:


Compensation will be paid in the range of $135,000 – $170,000 base salary + bonus. Restricted
Stock Units are included in all offers. Compensation is determined by the applicant’s education,
experience, knowledge, skills, and abilities, as well as internal equity and market alignment.

Crusoe is an Equal Opportunity Employer. Employment decisions are made without regard to race, color, religion, disability, genetic information, pregnancy, citizenship, marital status, sex/gender, sexual preference/ orientation, gender identity, age, veteran status, national origin, or any other status protected by law or regulation.

What you'll do

  • The Data Centre Construction Safety Manager will own site-wide health, safety, and environmental programs for hyperscale data center construction projects. This role involves leading safety oversight during critical phases of construction and ensuring compliance with safety regulations.

About Crusoe

Crusoe is the industry’s first vertically integrated, purpose-built AI cloud platform. The company is redefining AI cloud infrastructure and its platform is recognized as the "gold standard" among builders for its reliability and performance in developing, training, and deploying AI models. Powered by clean, renewable energy, Crusoe aligns the future of computing with the future of the climate. Leading Fortune 500 companies trust Crusoe’s advanced, AI-optimized cloud to support their most demanding AI applications.

Ready to join Crusoe?

Take the next step in your career journey

Frequently Asked Questions

What does Crusoe pay for a Data Centre Construction Safety Manager?

Toggle
Crusoe offers a competitive compensation package for the Data Centre Construction Safety Manager role. The salary range is USD 135k - 170k per year. Apply through Clera to learn more about the full compensation details.

What does a Data Centre Construction Safety Manager do at Crusoe?

Toggle
As a Data Centre Construction Safety Manager at Crusoe, you will: the Data Centre Construction Safety Manager will own site-wide health, safety, and environmental programs for hyperscale data center construction projects. This role involves leading safety oversight during critical phases of construction and ensuring compliance with safety regulations..

Is the Data Centre Construction Safety Manager position at Crusoe remote?

Toggle
The Data Centre Construction Safety Manager position at Crusoe is based in Abilene, Texas, United States. Contact the company through Clera for specific work arrangement details.

How do I apply for the Data Centre Construction Safety Manager position at Crusoe?

Toggle
You can apply for the Data Centre Construction Safety Manager position at Crusoe directly through Clera. Click the "Apply Now" button above to start your application. Clera's AI-powered platform will help match your profile with this opportunity and guide you through the application process.
Clera - Your AI talent agent
© 2026 Clera Labs, Inc.TermsPrivacyHelp

Join Clera's Talent Pool

Get matched with similar opportunities at top startups

This role is hosted on Crusoe's careers site.
Join our talent pool first to get notified about similar roles that match your profile.